How much cement, sand and gravel

How much cement, sand and gravel

Put in the size of the slab, floor or footing. You get how many bags of cement and buckets of sand and stone.

Size of the pour (slab, floor, footing)
Spare
You need to buy
7 50 kg bags of cement

For 0.9 m³ of concrete, with spare already added. A cement manufacturer's mix per bag: 4 buckets of sand, 5½ of stone and 1¼ of water (makes 8 buckets, 0.144 m³).

28 bucketsof sand (0.5 m³)
38.5 bucketsof stone or gravel (0.7 m³)
8.75 bucketsof water

18-litre bucket. Slabs, beams and columns that hold the house up need a structural engineer's design: check the mix with them.

How we work it out

Volume = length × width × thickness, plus spare. Bags = volume ÷ 0.144 m³, rounded up. Per 50 kg bag: 4 buckets of sand, 5½ buckets of stone and 1¼ buckets of water, the general-purpose mix published by a cement manufacturer.

Send this quote from your phone

In the app, this measurement turns straight into quote items, priced for your area, and goes to the customer as a PDF.

Quote ready in the appFree to start, no card