How much cement, sand and gravel
Put in the size of the slab, floor or footing. You get how many bags of cement and buckets of sand and stone.
You need to buy
7 50 kg bags of cement
For 0.9 m³ of concrete, with spare already added. A cement manufacturer's mix per bag: 4 buckets of sand, 5½ of stone and 1¼ of water (makes 8 buckets, 0.144 m³).
28 bucketsof sand (0.5 m³)
38.5 bucketsof stone or gravel (0.7 m³)
8.75 bucketsof water
18-litre bucket. Slabs, beams and columns that hold the house up need a structural engineer's design: check the mix with them.
How we work it out
Volume = length × width × thickness, plus spare. Bags = volume ÷ 0.144 m³, rounded up. Per 50 kg bag: 4 buckets of sand, 5½ buckets of stone and 1¼ buckets of water, the general-purpose mix published by a cement manufacturer.