How much cement, lime and sand for render
Put in the wall size and the thickness. You get how many bags of cement and buckets of lime and sand.
7.7 m² of wall at 2 cm, with spare already added. Mix of 1 part cement, 2 parts lime and 9 parts sand (a cement manufacturer's figure: 35 m² at 1 cm per bag).
This mix is for internal render. External walls need a stronger mortar: follow the instructions on the ready-mixed render bag.
€255 for labour, the most common rate in Ireland (€13 to €50 per m²).
How we work it out
Area = length × height, less 1.68 m² per door and 1.80 m² per window. Bags = m² × thickness in cm ÷ 35, plus spare, rounded up. Lime = 2 buckets and sand = 9 buckets for each bucket of cement (a bag makes about 2 buckets). General-purpose mix published by a cement manufacturer.
Send this quote from your phone
In the app, this measurement turns straight into quote items, priced for your area, and goes to the customer as a PDF.