How to estimate for a refurbishment
Contractor guide
Step by step
- Visit and photograph the before: it protects you if anyone disputes things later.
- Split it into stages and measure each one (sq ft, foot, unit).
- Price the labor for each stage.
- List the materials separately, or write who's buying them.
- Write the timescale for each stage, the deposit and how the rest is paid.
- Agree in writing: if the work changes, you do a change order.
Per sq ft or day rate?
Flooring, render and screed price well per sq ft. Work full of surprises (old repairs, demolition) is safer on a day rate. Use the day rate for your area as a guide.
See remodeler and refurbishment pricesDid the work change halfway? Change order
Found a rotten pipe behind the tiles? Note down the change and the price there and then, with the customer beside you. In Vistobra the change order comes out as a PDF with their signature, and the amount goes onto the bill.
See change ordersA refurbishment agreed in writing, from start to finish
Free to start · no card needed · cancel in one tap
Questions
How much deposit should I ask for on a refurbishment?
30% to 50% is common, to cover the materials and the start. Write on the estimate how much, when, and what happens if the job is cancelled.
Who buys the materials?
Agree it beforehand. If you buy them, put them on the estimate with the price. If the customer does, have the list ready for them to take to the shop.
How do I prove what was done?
Before and after photos of each stage, with the date and time. In the app every photo comes with a stamp and a code the customer can check.