Estimate template
Free · no sign-up · prices for your state

Free Post-Construction Cleaning Estimate Template

Comes with the usual post-construction cleaning line items and real prices already filled in. Adjust it, download the PDF and text it to your customer in two minutes.

  • Real prices by state
  • PDF with your business name
  • Ready to text or email
  1. 1Fill it inon screen, prices already suggested
  2. 2DownloadPDF, Word or Excel
  3. 3Send itby text or email

Fill in your estimate

What’s your trade?

Jobs already come with your country’s reference price. Just tap.

No jobs yet$0.00

What to include in a post-construction cleaning estimate

01Your business and the customer

Business name, phone, license number if your state requires one; the customer's name and the job address.

02One line per item

Light post-construction cleaning (dust and light splashes); Heavy post-construction cleaning (cement, mortar and varnish); Deep clean full or queen mattress: quantity, unit and price in separate columns, so the customer sees what each part costs.

03Materials

Who buys them, and whether they're included in the price.

04Timeline and expiration

When you can start, how long it takes, and how long the price is good for.

05Payment terms

Deposit, when the balance is due, and how you take payment (card, Zelle, check).

06Warranty and signature

What you guarantee and for how long, with a line for the customer to accept.

Post-Construction Cleaning estimate example (Florida prices)

ItemQtyPriceTotal
Light post-construction cleaning (dust and light splashes)300 sq ft$0.30$90
Heavy post-construction cleaning (cement, mortar and varnish)300 sq ft$0.45$135
Deep clean full or queen mattress1 each$100$100
Estimate total$325

Typical labor price in Florida on the Vistobra price table. Change the quantities and prices in the template above.

Same job, five states

Light post-construction cleaning (dust and light splashes) (sq ft): the typical price and the usual range.

Florida$0.30$0.15–$0.40
Texas$0.25$0.15–$0.35
California$0.35$0.20–$0.50
New York$0.35$0.20–$0.45
Massachusetts$0.35$0.15–$0.45

Labor adjusted to each state with BLS wage data (May 2025). See every state →

What usually goes on a post-construction cleaning estimate

  • Light post-construction cleaning (dust and light splashes)$0.15–$0.40/sq ft
  • Heavy post-construction cleaning (cement, mortar and varnish)$0.45–$0.50/sq ft
  • Deep clean 3-seater sofa$100–$400
  • Deep clean full or queen mattress$60–$150
  • Exterior wall pressure washing$0.35–$0.75/sq ft
  • Post-construction cleaning, per day$140–$240/diária
  • Medium post-construction cleaning (paint and cement splashes)$0.20–$0.60/sq ft
  • Deep clean 2-seater sofa$70–$200
  • Deep clean armchair$40–$80
  • Deep clean upholstered chair (each)$20–$40
  • Deep clean twin mattress$72–$110
  • Deep clean king-size mattress$110–$160

Text to send with your estimate

Customer
Hi [Client name], thanks for having me out today. Here's the estimate for the cleaning we talked about: every item is listed with the quantity and price, plus the timeline and payment terms. This estimate is good for [30] days. If it looks good, just reply "approved" and I'll lock in your start date. Any questions, call or text me anytime.09:41 ✓✓

Change the parts in brackets. Send the text first and the PDF right after: customers read the message before they open the file.

Snap a photo and AI writes the estimate

In the Vistobra app, take a photo of the job and the post-construction cleaning estimate comes out ready, priced for your state. The customer approves from a link and pays the deposit by card.

Frequently asked questions

Is this post-construction cleaning estimate template really free?

Yes. No sign-up and no credit card: fill it in on this page and download the PDF, or download the Word and Excel files and edit them on your computer. The PDF carries your business name and contact.

Are the prices right for my state?

They are the typical labor prices on the Vistobra price table, adjusted to each state with the state wage data from the U.S. Bureau of Labor Statistics (May 2025). Use them as a starting point and change them to your own rates.

Should materials go on the estimate?

Say who buys them. List materials on their own lines (or write "materials by owner") so the customer sees what the labor price covers and doesn't compare apples to oranges.

How much deposit can I ask for?

It depends on the state. In California, a home-improvement deposit can't be more than 10% of the contract price or $1,000, whichever is less (CSLB). Other states have no fixed cap, but write the deposit, when it's due and what happens if the job is canceled.

Estimate, quote or bid: what's the difference?

An estimate is your best guess of the cost and can change if the job changes; a quote is a fixed price for a defined scope; a bid is a quote sent to compete for a job. Write which one you're sending and how long it's valid.

What about sales tax?

Sales tax on labor and materials depends on the state and city. Add it as its own line if it applies to your job.

More free templates